I finally started my obsy build this afternoon.

Site before-

002.jpg

The pier pipe purchased, 150mm x 2m.

003-3.jpg

Site cleared and pier hole half dug, shed ordered.

North is in the corner to the left.

Link to comment
Share on other sites

Its where I always observe from and Polaris is easily visible, I think the camera foreshortens the distance to the house behind.

Link to comment
Share on other sites

Building an obsy was the best thing I have done, saves a lot of time and effort lugging kit about, good luck on the build!!

Link to comment
Share on other sites

I would love one but then I never have the time to build one, hope it turns out well.

Link to comment
Share on other sites

An obsy is my on-going project, one day I'll start it.

Link to comment
Share on other sites

the cat looks very interested in what your doing,

keep the pictures coming,

i too have started my obsy, managed to lay 6 slabs in a week ! at this pace i`ll be done by christmas

Link to comment
Share on other sites

We should organise an obsy building party one weekend, Slab laying, shed building etc.. as long as there is a large full teapot I'd be game, good idea??

Link to comment
Share on other sites

I think the hardest part is the location! When that's sorted you have an idea of the size you can use. Decide on a design (considering size etc..), Base type, pier size and start digging!! That's when the party arrives!!

Link to comment
Share on other sites

Well when you do get started, think about the building party idea? Always good to get together !! :)

Link to comment
Share on other sites

A proper builders merchants have pipe in about 6" to 10". I know that because when I was building our extention I went down there to pick up some supplies and saw it. It's that yellow ABS plastic pipe for sewers etc.

Link to comment
Share on other sites

Little bit more done today -

002-1.jpg

Hole now 2x2x2 foot, angle iron (5foot) knocked in.

001-1.jpg

Pipe cut and 2 stainless rods threaded through. The rods help centralise the pipe on the angle iron.

003-4.jpg

Now waiting to be concreted on Monday.

Link to comment
Share on other sites

Check the threads on SGL on obsy builds, theres loads of good info!!

Link to comment
Share on other sites

I've got a 8 foot x 6 foot apex shed (windowless) on the way.

The pipe is 5 foot 9 inches long after I chopped about 9 inches off, so 3 foot 4 inches above ground level which should be 3 foot above shed floor level.

5 inches is buried in the soil at the bottom of the hole already.

Link to comment
Share on other sites

Day off at Wembley yesterday courtesy of work, watched Luton get beat by York City.

001-2.jpg

Today was concrete day, 350 Kgs mixed by hand (spade). 3 aggregate to 1 cement mix.

Mounting bolts M10 set in top of pier and central rod which is M6 thread and 1.5m long added for safety. (I worry).

Forgot to mention before, the bottom of the hole is about 6 inches wider than the top.

Link to comment
Share on other sites

cat still inspecting the work,

looking good so far,

i managed to get 3 more slabs down today for my base, only 3 more to go !

Link to comment
Share on other sites

Looking good Andy.

Cat looks baffled by it all, but it looks like you have an observing buddy!

Link to comment
Share on other sites

The cat appears every time I get the camera out!

I ache today. :mellow:

Link to comment
Share on other sites

Just been outside - concrete is curing well, damped it down and re-covered. It looks like its going to be a hot one today so I will damp it down again later and keep it covered.

Link to comment
Share on other sites

Latest update -

Been working hard today leveling the ground and making the base.

Installed 40mm pipe as a conduit for the cables.

001-4.jpg

When the shed is built it will have another 18mm floor on top of a damp barrier.

Different foreman this time.

Link to comment
Share on other sites

That obsy looks to be coming on great. Can't wait to see the finished thing.

Link to comment
Share on other sites

Looking great Andy. Is it possible the cats interest may extend to it having time at the eyepiece?

Link to comment
Share on other sites

Well the walls are up!

001-5.jpg

Roof will have to wait until my next 4 days off. :wacko:

Edited by andyboy1970
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.